Abstract:Based on the comparison of several positioning methods for gravity wharf blocks,and combining with the actual construction experience of Guinea,we put forward the proposal which combines the measurement frame positioning with the underwater & above-water positioning methods to raise the placing efficiency of blocks and guarantee the erecting quality,hoping to serve as reference for similar engineering.