Control technique of revetment construction in phase II container terminal of port Said east
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Taking the Suez Canal container terminal phase II marine works for example,and aiming at the technical measures adopted by the 56 m3 grab dredger in the construction of the basin and revetment,we put forward the new improved method of large capacity hydraulic grabs in the revetment. The results indicate that the new method has an advantage over the traditional ones in the control and operation of dredging. So it is awarded for its excellent jobs and effective control of the over-depth and over-width of the slop. It also benefits for the contracture of the armor layer and mixing filter layer,and thus reduces the construction cost.

    Reference
    Related
    Cited by
Get Citation

任 慧,白胜强.埃及塞德东港二期集装箱码头边坡施工控制工艺[J].水运工程,2016,(2):167-170

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: February 03,2016
  • Published:
Article QR Code