New modification program of projection distortion in survey of the Yangtze River engineering
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the engineering survey of Yangtze River waterway,the correction of length deformation in Gauss projection is especially important. The rapid static positioning can quickly acquire the accurate coordinate and baseline information. In case that the influence of the earth curvature on horizontal distance can be ignored,this paper illuminates an original method which employs the exact baseline information acquired by rapid static positioning to calculate the real distance using the baseline horizontal projection on ellipsoid tangent plane,and finally corrects the length deformation. The results indicate that,the deviations between corrected distance and the corresponding distance measured by the total stations are all at cm level,and the maximum deviation is 1.4 cm,which satisfies the requirement of the engineering survey of the Yangtze River waterway.

    Reference
    Related
    Cited by
Get Citation

张国平,舒晓明,刘 力,梁向棋,梁超峰.长江航道工程测量投影变形修正新方案研究及试验[J].水运工程,2016,(2):25-27

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: February 03,2016
  • Published:
Article QR Code