Influence of estuary regulation project on hydrodynamic conditions in Guanhe estuary
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To predict the impact of regulation project on the tidal prism,tidal level and velocity at the Guanhe estuary and provide the optimal regulation plan of the Guanhe estuary,we analyze the natural conditions of the estuary firstly,then build a two-dimensional mathematical model,which is verified by measured filed data,and finally analyze the changes of hydraulic characteristics after the project by the mathematical model.The result shows that waterway dredging project should be carried out with the regulation project because leading jetties can decrease the tidal prism significantly;After implementation of the leading jetty engineering and waterway engineering,the velocity of the flow between the double jetties increases.

    Reference
    Related
    Cited by
Get Citation

董 佳,刘 勇,熊 伟.灌河口水动力条件对口门整治工程响应分析*[J].水运工程,2015,(10):125-131

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 16,2015
  • Published:
Article QR Code