Abstract:It’s extremely difficult to clean up residual sand from the filtration wells after backfill construction is completed in buttresses gravity wharf.The partial replacement method is studied based on the second oil service base and heavy cargo wharf project engineering,Luanda,Angola.A barrier layer between the backfill sand and buttresses is formed,which blocks the backfill sand to filter down flowing wells and cleans the residual sand filter wells efficiently and completely .