Key technology in reinforcement and reconstruction of high-piled wharf
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper introduces researches on main problems including the layout and working process reform,reinforcement and reconstruction technology and slope stabilization in the reinforcement and reconstruction of built piled wharf of Ningbo Guangming No.1 berth,and gives the final scheme,which is safe,with less disturbance on the normal work,economical and reliable.Thus it may serve as reference for similar engineering.

    Reference
    Related
    Cited by
Get Citation

戎伟全,周 娜.高桩码头结构加固改造技术[J].水运工程,2015,(9):104-107

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 10,2015
  • Published:
Article QR Code