Abstract:This paper introduces researches on main problems including the layout and working process reform,reinforcement and reconstruction technology and slope stabilization in the reinforcement and reconstruction of built piled wharf of Ningbo Guangming No.1 berth,and gives the final scheme,which is safe,with less disturbance on the normal work,economical and reliable.Thus it may serve as reference for similar engineering.