New technology for repairing and strengthening of breakwater of Diaobang fishing port
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Diaobang fishing port is an important part of Wenling central fishing port,and its breakwater’s armor structure is seriously damaged by the ultra-strong typhoon “Kanu” & ”Matsa” and thus exists security risks.The repairing technical difficulty lies in the dispose of thousands of artificial blocks.Testing the section model of wave and then determining the design drawings,we adopt the new technology of forming cushion after block decomposition to solve the technical difficulties of repairing project.After completion of the repairing and strengthening project,the resilience of Diaobang fishing port has been increased to 100 years once.

    Reference
    Related
    Cited by
Get Citation

赵子文,陈德春,江根青,陈开来,陈云华.钓浜渔港防波堤修复加固新技术[J].水运工程,2015,(9):99-103

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 10,2015
  • Published:
Article QR Code