Construction technology of rock-embedded cast-in-situ pile in bare rock of the Yangtze River steep slope
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Using auxiliary piles as the foundation platform to set up the platform,the problem concerning the construction platform for the rock-embedded cast-in-situ piles in the bare rock of the Yangtze River steep slope is solved;Employing planting piles in the rock surface slope,box type guide frame and steel playing up technology,the sinking operation of the super long and large-diameter steel tube under the condition of bare rock and torrents of the Yangtze River is implemented.

    Reference
    Related
    Cited by
Get Citation

QI Ying-ming, TAN Yong-an, FU Ji-cheng, et al. Construction technology of rock-embedded cast-in-situ pile in bare rock of the Yangtze River steep slope[J]. Port & Waterway Engineering,2015(8):113-115.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 12,2015
  • Published:
Article QR Code