Abstract:Taking the crest rail beam installation in the navigation-power junction discharge sluice in Xiangjiang river for example,we analyze the installation environment and possible installation mode of the crest beam,and establish a comprehensive installation mode,i.e.homemade hydraulic lifting equipment and erection of beam transportation channel successful,by which we fulfill the installation of the single track beam smoothly.