Abstract:In combination with the practical situation of engineering,in order to reduce the engineering cost,we adopt site splicing of the steel pipe piles and inflatable capsule plug float hauling method during the construction of piles.Based on the analysis of the feasibility of steel pile floating,we introduce the plug fabrication and installation and the mode of float hauling method,and analyze its advantages.This method achieves a satisfactory effect during construction.