Reasons of bored pile’s plugging and countermeasures
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Plugging often happens during construction of bored piles,which affects the engineering quality or leads to pile’s scrapping.To reduce this risk,we carry out a theoretical analysis on the plugging reasons and take multiple measures such as due vibro-flotation in practice.Moreover,we develop the vibration hammer impacting method and re-insert catheter.The engineering effect is remarkable,and it may serve as reference for other projects.

    Reference
    Related
    Cited by
Get Citation

张 军,李 鉴.灌注桩施工堵管原因及处理措施[J].水运工程,2015,(8):87-89