Abstract:Plugging often happens during construction of bored piles,which affects the engineering quality or leads to pile’s scrapping.To reduce this risk,we carry out a theoretical analysis on the plugging reasons and take multiple measures such as due vibro-flotation in practice.Moreover,we develop the vibration hammer impacting method and re-insert catheter.The engineering effect is remarkable,and it may serve as reference for other projects.