Excavation technology of lock foundation pit in special soft foundation
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The lock’s foundation pit is usually excavated in dry condition formed by dewatering.Based on the analysis of the special foundation Yunyan river lock which consists of soft soil and silty soil,and combining with the actual excavation,we research a new method to avoid the traditional dewatering method.According to the research on the local trial-excavation technology for the chamber soil,we sum up a new construction technology that can directly excavate the chamber’s deep foundation pit,set the inverted filter locally and utilize water channel in the permeable area.

    Reference
    Related
    Cited by
Get Citation

邱晓军,张 亚.特殊软基地层条件下闸室基坑开挖施工技术[J].水运工程,2015,(8):84-86

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 12,2015
  • Published:
Article QR Code