Pile construction technology for reconstruction of high-pile wharf
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on a high-piled wharf upgrading project,we expound the piling technology,i.e.piling between bents of the original wharf after demolishing the original wharf,and the new piling technology which combines the vibration hammer with the diesel hammer in the area seriously influenced by the neighboring structures and with complicated geologic conditions,to serve as reference for the piling construction of similar projects.

    Reference
    Related
    Cited by
Get Citation

郭喜柱,叶跃平,佟冠中.高桩码头改建沉桩施工工艺[J].水运工程,2015,(8):74-77