Installation method of berthing member under condition of high water level
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This article describes the installation method of berthing members under the condition of high water level when the conventional method can’t be implemented.Analyzing the construction process and final results,we know that the method presented here ensures the smooth installation construction of the berthing members and girders as well,so as to lay a foundation for the continuous construction of the whole project.

    Reference
    Related
    Cited by
Get Citation

黄海华,陈 峰.高水位条件下靠船构件安装施工技术[J].水运工程,2015,(8):71-73