Abstract:According to the actual construction process of air cooling system of the Fuchun river lock expansion and improving project,through the real-time monitoring of coarse aggregate,mixing water,the concrete mixer outlet temperature and pouring temperature,this article gives a comprehensive study on the cooling capacity of the air-cooling aggregate and its cooling water system,to provide guidance for the later construction.