    The current domestic large temporary works mainly adopt steel structures for the recycled use.As the load on the large temporary works become heavier,the steel structures would cost more.Therefore,it is a challenge to ensure the safety of the structure and reduce steel consumption as far as possible.This article describes the design of the girder upgrading gantry for a temporary dock project of HZMB.Adopting different structure forms and making full use of the existing materials,we finally determine the reasonable structure of the gantry.

    Reference
    Related
    Cited by
Get Citation

周 伟,熊 彪,王孝兵.港珠澳大桥某预制场临时码头工程提梁门架设计[J].水运工程,2015,(8):21-26

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 12,2015
  • Published:
Article QR Code