Application of industrial prefabrication technology of immersed tunnel in Hong Kong-Zhuhai-Macau Bridge project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Hong Kong-Zhuhai-Macau Bridge project is the deepest buried depth of immersed tunnel in the open sea.The tubes in this project have large cross sections,heavy weight,and high standard of crack resistance of concrete.It is the first one using industrial prefabricated immersed tubes for tunnel construction in China.Due to complexities of the prefabrication technology,deep studies were made to develop various improvements and innovations.This paper mainly outlines the industrial prefabrication technology and its application.

    Reference
    Related
    Cited by
Get Citation

翟世鸿,吴海波,杨秀礼.沉管工厂化预制技术在港珠澳大桥工程中的应用[J].水运工程,2015,(8):1-5

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 12,2015
  • Published:
Article QR Code