CSD construction process optimization for Huaneng Caofeidian coal terminal project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Caofeidian reclamation engineering is characterized by fine grain and long blowingdistance ,and the production capacity is low.In order to improve the construction productivity and reduce the construction cost,we analyze the CSD mining and transport data,and mud pump cavitation point to study the optimization of the construction technology.By the optimized construction technology,the construction productivity of Caofeidian reclamation land reclamation project is increased by 15%,the construction cost is cut down and the construction period is shortened.

    Reference
    Related
    Cited by
Get Citation

刘 昊,张亚楠.华能曹妃甸煤码头工程绞吸船施工工艺优化[J].水运工程,2015,(5):213-215

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 15,2015
  • Published:
Article QR Code