Method of prestressing tendon layout based on zero bending moment of dead load theory
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Mid-span deflection is widely spreaded in prestressed concrete bridges,and the root cause is that the bridge structure in the construction process accumulated unbalanced moment.In order to fundamentally solve the problem,and reduce the unbalanced moment,based on zero bending moment of dead load theory,this paper studies the arrangement of tendon with beeline and curve in concrete bridges and deduces relevant calculation formulas of prestressing tendon layout.The method of prestressing tendon layout is established and verified to be effective by examples,and the mid-span deformation of prestressed concrete bridges is controlled initiatively.

    Reference
    Related
    Cited by
Get Citation

陈海波,李新平.基于恒载零弯矩理论的预应力配束方法[J].水运工程,2015,(3):196-200

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: March 20,2015
  • Published:
Article QR Code