Durability strategy for main concrete structure of Hong Kong-Zhuhai-Macao bridge with designed service life of 120 years
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The service life of Hong Kong-Zhuhai-Macao bridge,which crosses the Pearl river estuary,is designed as 120 years.How to improve the durability of concrete structure located at the open sea with high temperature and humidity became one of the most important issues for the bridge construction.The systematical research on the concrete durability was carried out before and during the construction period based on the engineering practice.Based on the research,the strategies and measures for the durability design,construction and maintenance,which were applied to ensure the service life of 120 years,are expounded.

    Reference
    Related
    Cited by
Get Citation

王胜年,李克非,范志宏,苏权科,熊建波.港珠澳大桥主体混凝土结构120 a使用寿命耐久性对策*[J].水运工程,2015,(3):78-84

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: March 20,2015
  • Published:
Article QR Code