Construction technology of marine rock-socketed cast-in-situ bored pile with large diameter and super length
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper focuses on the construction technology of cast-in-situ bored piles of the main bridge of the Second Penang Bridge of Malaysia. The main bridge of the Second Penang Bridge of Malaysia is a double-tower cable-stayed bridge. Each tower is supported by 21 pieces of φ 230 ~ 200 cm bored piles with a maximum length of 126.9 m. The piles are designed to be socketed into the penetrating weathered rock layer of 8 m in depth, and with a maximum bored-hole layer of 133.15 m in length. From the construction management on marine bored pile of the Second Penang Bridge, we sum up construction techniques of the equipment selection, drilling, concreting, statistic test of bored pile and others, and accumulate valuable experience for similar pile construction.

    Reference
    Related
    Cited by
Get Citation

江和明,荣劲松.海上超长大直径嵌岩钻孔灌注桩施工技术[J].水运工程,2015,(2):156-162

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: February 16,2015
  • Published:
Article QR Code