Calculation and analysis of the minimum discharge about hydropower station under condition of satisfying navigation standard
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Xiangjiaba hydropower station in Jinsha river has stored to normal level,but its shipping parameters is still a big controversy.To protect the upper Yangtze River’s main basic maintenance dimensions,we carry out a research on the minimum discharge of Xiangjiaba hydropower station in Jinsha river by the guaranteed frequency method,reverse flow method about waterway maintenance scale,natural inflow ratio with the score distribution method,etc. The result shows that the natural inflow ratio with the score distribution method is more suitable for hydropower station in branch streams,and the minimum discharge of Xiangjiaba hydropower station should not be less than 1 296 m3/ s.

    Reference
    Related
    Cited by
Get Citation

刘 勇,张 毅.满足通航标准条件下电站最小下泄流量计算与分析*[J].水运工程,2015,(1):134-138

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 16,2015
  • Published:
Article QR Code