Experimental research on phaseⅠ of Anqing reach regulation project and analysis of regulation effect
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In recent years,the left-branch of Anqing river course tends wider and shallower because of the development of its mid-branch,thereby it causes the obstruction of navigation.This paper analyzes the causes of navigation obstruction and demonstrates the regulation schemes based on the river model experiment.After implementation of the phaseⅠ project during 2010 and 2011,the navigation condition is improved obviously and the waterway keeps smooth in the dry season.Preliminary regulation effect has been achieved.

    Reference
    Related
    Cited by
Get Citation

赵德玉,王 涵,郑 英,关永熙.安庆河段航道整治一期工程方案试验和效果分析[J].水运工程,2014,(12):106-109

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 18,2014
  • Published:
Article QR Code