Engineering scheme and effect of phase I of Madang reach regulation project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In recent years,Mazu waterway of Madang reach appears new changes,and the waterway maintenance turns increasingly difficult.The primary cause of such issue is summarized as turbulence at the upstream reach,and shallow depth at downstream.Based on the experimental investigation to the reason why the Mazu waterway results in an obstruction,12 programmes are studied in fixed-bed models and 6 programmes are studied in movable-bed models,and determines at last the recommended engineering scheme.After implementation of the project during 2009 and 2010,the waterway condition is improved obviously.

    Reference
    Related
    Cited by
Get Citation

王 涵,赵德玉,关永熙,郑 英,游强强.马当河段航道整治一期工程方案及效果分析[J].水运工程,2014,(12):102-105

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 18,2014
  • Published:
Article QR Code