Abstract:The plant drain takes up a lot of quality shorelines,so it is of great importance to study this kind of shoreline.By studying the impact of the scope of drain on the pier,we determine the siting plan for the shared Anqing power plant drain.Comparing with other siting options,the recommended plan has the advantages of energy saving and environmental protection for the integrated use of the shoreline.