Cause of PHC pile damaging during piling and construction countermeasures
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the PHC pile construction process,based on the on-site tracking,we analyze the possible causes for the pile quality problems and try to find out the effective way of controlling the piling problem,optimizing the construction of the foundation pile,and lowering as possible as we can the pile damaging rate during piling construction.