Application of elevated pile caps and prestressed anchor structures in the third line and the fourth line ship lock of Changzhou hydro-junction
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Taking the third line and the fourth line ship locks of Changzhou hydro-junction for example,this article presents a new navigation wall structure suitable for site conditions limited,namely the composite structure of elevated pile caps and prestressed anchor.This structure improves effectively the condition of the pile foundation internal forces and controls the deformation of the structure through jointing actions of elevated pile caps with the prestressed anchor.When the site conditions are limited,using loads are large and common structures are not appropriate.

    Reference
    Related
    Cited by
Get Citation

吴信,王大伟.高桩承台加预应力锚索结构在长洲三线四线船闸中的应用[J].水运工程,2014,(9):126-130

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 18,2014
  • Published:
Article QR Code