On artificial measures to improve hydrologic condition for port construction of Nianyuwan harbor area in Dalian port
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Before the construction of Shatuozi diversion dike in Nianyuwan harbor area of Dalian port,the cross-flow of No.22 berth is larger and mooring condition of berths No.17~No.21 is so poor.In order to improve the hydrological condition,tidal flow mathematical model and physical model is set up to study flow field as while as wave physical model is set up to study waves.On the base of comprehensive comparison flow and waves factors.this paper analyzes the layout and hydraulic structures of Shatuozi diversion dike project,and explores the whole thought and research method of artificial measures to improve the hydrologic condition of port construction,which may serve as reference for other similar projects.

    Reference
    Related
    Cited by
Get Citation

蔡翠苏,梅蕾,吴澎.人工措施改善大连港鲇鱼湾港区建港水文条件研究[J].水运工程,2014,(9):71-77

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 18,2014
  • Published:
Article QR Code