Abstract:Based on the research on the construction cycle and construction parameters of TSHD,we determine the optimal loading time,so as to improve the TSHD productivity and reduce the construction cost.The determination of the optimal loading time of TSHD improves the TSHD construction productivity of Huanghua port 200 000 ton waterway and reduces the construction cost.