    To improve the TSHD’s construction productivity and reduce the construction cost,we analyze the TSHD construction data,carry out soil sampling test,and optimize the construction technology of TSHD.The implementation of the new construction technology has increased the construction productivity of Tianjin Port 300 000 DWT waterway by 37%,speeded up the construction progress,and cut down the construction cost.

    Reference
    Related
    Cited by
Get Citation

刘昊,张亚楠,秦亮.天津港30万吨级航道耙吸船施工工艺优化[J].水运工程,2014,(6):154-157