Stucked-avoiding technology for new floating mooring device on vertical pier
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Drastic fluctuations of water level caused by peak regulation and flood discharge in the upstream affect directly the safety of berthing and terminal operation in the downstream vertical piers.A new floating mooring device based on the lock floating bollard provides a solution to the above problem.To verify the reliability that the mooring device can lift up and down freely under complex running resistances,this paper makes further study on the mooring device about one system and multi-system cases,and a group of guide-wheels and a linkage are proposed respectively to solve the stucking problems caused in the two cases.This study lays a solid foundation for the mooring device used in the actual project and serves as reference for similar projects as well.

    Reference
    Related
    Cited by
Get Citation

王芳芳,陈明栋,吴时强,况曼曼.新型码头浮式系缆装置防卡死技术分析*[J].水运工程,2014,(5):52-58

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 16,2014
  • Published:
Article QR Code