General layout for Wangdao navigation junction in Xiaoqinghe channel
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Wangdao navigation junction is the key project of recovering navigation in Xiaoqinghe Channel.Based on the analysis of the restrictive factors for Wangdao navigation junction,we compare three layout schemes from such aspects as the river bend,bridge construction,the plane layout for ship lock,influence on riverside facilities,and the project investment.The results indicate that the scheme of moving check gate has the least bridge span length,the lowest project investment in all of the schemes,and the layout for ship lock is more rational.So it’s recommended as the optimal scheme.

    Reference
    Related
    Cited by
Get Citation

杨尊伟,戈国庆,耿 卓.小清河王道航运枢纽总体布置最优方案比选[J].水运工程,2014,(4):116-120

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: April 16,2014
  • Published:
Article QR Code