Abstract:Based on the introduction and research on key technologies of structure selection and design for a typical ultra deep foundation trench gravity quay,we analyze the main factors about structure selection,and propose countermeasures for the layer selection,foundation trench excavation,foundation trench’s riprapping,bearing capacity’s guaranteeing,and settlement control in the design.It can provide reference for similar engineering designs.