Abstract:Based on a typical project of foundation pit supporting in Zhuhai port, this paper analyzes the technological requirements of SMW method under complicated geological conditions, discusses the lateral displacement of steel cement treated column and groundwater level changes in soft soil-layers according to monitoring results during and after the excavation, and proposes accordingly the alarming value of wall deformation rate in experience under the condition, which can provide valuable reference for similar excavation works.