Construction efficiency of Xinhai’e ship in the third harbor basin of Caofeidian
DOI:
CSTR:
Author:
Affiliation:
Clc Number:
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
Based on the summarization of the experience that the Xinhaie CSD work in third harbor basin in Caofeidian, this paper proposes several measures to ensure the safety of construction, improve construction efficiency, and reduce the cost.