Comparative analysis of layout and structure of filter dam at Zhangjiawan of Zhougongdi waterway
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to guarantee the normal operation of Yanjiatai sluice gate, a gap exists in the layout scheme of the waterway regulation project of Zhoutian river. Due to the broadened local waterway, sediment deposits to form shallow ridges. A filter dam will be constructed in Zhoutian river (between Changmenxi and Xiongjiazhou of the waterway regulation project of Jingjiang, the Yangtze River) to reduce sediment deposition and minimize relevant effects on Yanjiatai sluice gate. The research focuses on the layout and structure type design, and provides a theoretical basis for the successful implementation of this project.

    Reference
    Related
    Cited by
Get Citation

郑惊涛,雷国平,朱文清,谷祖鹏,余 珍.周公堤水道张家湾透水坝平面布置及结构形式比较分析[J].水运工程,2014,(3):130-133

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: March 19,2014
  • Published:
Article QR Code