Rapid installation process of berthing member of high-pile pier
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Being an important procedure of high-pile pier, berthing member installation is related to the construction progress of pier upper structure and the straightness of pier front edge, In order to improve the installation efficiency and save the construction cost, we present a rapid installation process, which is proved reliable and practical by the calculation analysis and engineering practice.