Underwater pipeline laying in phase I project of Lianyungang 300 000-ton channel dredging
DOI:
CSTR:
Author:
Affiliation:
Clc Number:
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
This article deals with the underwater pipeline laying methods and measures for pipe damaging and blocking with case study of phase I project of Lianyungang 300 000-ton channel dredging, for the purpose of minimizing the suspension of pipeline-failure-related work and speeding up the project progress.
Reference
Related
Cited by
Get Citation
SHEN Xu-bing, GE Wei-dong, GE Wei-dong, et al. Underwater pipeline laying in phase I project of Lianyungang 300 000-ton channel dredging[J]. Port & Waterway Engineering,2013(5):184-188.