Underwater pipeline laying in phase I project of Lianyungang 300 000-ton channel dredging
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This article deals with the underwater pipeline laying methods and measures for pipe damaging and blocking with case study of phase I project of Lianyungang 300 000-ton channel dredging, for the purpose of minimizing the suspension of pipeline-failure-related work and speeding up the project progress.

    Reference
    Related
    Cited by
Get Citation

SHEN Xu-bing, GE Wei-dong, GE Wei-dong, et al. Underwater pipeline laying in phase I project of Lianyungang 300 000-ton channel dredging[J]. Port & Waterway Engineering,2013(5):184-188.