New-type hanging point for concrete structures
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The form of handing point in small concrete structures like the cable trench cover is changed from the ring pull to the bolt connection. Concrete members are manufactured by pre-embedding the nut and then transported and erected by special bolt hanger, which shows obvious advantages in improving the appearance quality of concrete members and avoiding erosion of concrete members induced by ring-pull’s rusting. Meanwhile, it presents a new idea on the form of the hoisting point of concrete members.

    Reference
    Related
    Cited by
Get Citation

GAO Ping-yuan, ZHU Tie-kun, SUN Zong-jin. New-type hanging point for concrete structures[J]. Port & Waterway Engineering,2013(1):176-178.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 15,2013
  • Published:
Article QR Code