Abstract:In inland river waterway regulation project, adopting the whole overall-steel-mould slippage technology and craft of belt-machine gating system, the construction of concrete-vertical dock wall is accelerated,which ensures the construction progress and lower the cost. It is a rapid construction technology of safety, quality,efficiency, and low cost, which set an example for related projects.