Border dike closure construction of the second dredger fill area in phase I project of Lianyungang port 300 000 DWT Xuwei harbor area
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper summarizes the closure construction experience of border dike which is on deep soft soil foundation, and in open sea, deep water, 5 square kilometers reservoir area. The construction makes full use of the permeability of riprap dike and water thrown by large engineering ship, and using horizontal and vertical closure combined technology, heightening the bottom elevation and narrowing vertical width of closure gap. The construction technology not only reduces requirements of the rock size, but also reduces the risk and cost of closure construction.

    Reference
    Related
    Cited by
Get Citation

沈雪松.连云港港30万吨级航道一期工程徐圩吹填2区围堤合龙施工[J].水运工程,2013,(1):166-171

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 15,2013
  • Published:
Article QR Code