Key technology about master plan of Pingtan port area in Fuzhou port
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the analysis of some key technological schemes of Pingtan port area including function orientation, throughput development forecast and selection of initiation project, this paper puts forward new ideas and new methods for solving key problems in the master plan of the newly developed port area, Pingtan port area,which may serve as reference for the master plan of similar projects.

    Reference
    Related
    Cited by
Get Citation

CAO Yu-kun. Key technology about master plan of Pingtan port area in Fuzhou port[J]. Port & Waterway Engineering,2013(1):90-95.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 15,2013
  • Published:
Article QR Code