Construction monitoring for artificial island
Author:
  • Article
  • | |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    according to the geologic survey report, the engineering area of an artificial island is characterized by weak soil such as silty clay, clay and silty clay, high dike, tight time schedule, fast construction of embankment and reclamation, as well as ununiform construction speed, so it is necessary to carry out construction monitoring for dike foundation and dredger fill area. The construction is guided and controlled by layered settlement, deep displacement, pore water pressure and other construction monitoring methods, which effectively prevent foundation slide or large displacement, thus ensure the safety of construction and meet the requirement for use. The analysis of monitoring data may serve as reference for similar works.

    Reference
    Related
    Cited by
Get Citation

孙近阳.人工岛施工监测*[J].水运工程,2012,(12):200-203

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Online: December 11,2012
Article QR Code