Abstract:According to the small wave, undulate of beach characteristics of engineering zone, we propose the semi-circular breakwater with concrete wall for the first time, which can increase the vertical concrete wall at the top of the semi-circle structure, narrow radius of the semi-circle structure, reduce engineering quantity of semicircular breakwater, and save project costs. Furthermore, we make a brief introduction to the design calculations and economic analysis.