Engineering design of phase I reclamation dike of 300 000 DWT waterway engineering in Lianyungang port
DOI:
CSTR:
Author:
Affiliation:
Clc Number:
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
The reclamation dike which is about 18km long in the first phase of the 300 000 DWT waterway engineering in Lianyungang Harbor has great impact on the investment and construction progress. This paper puts forward the construction proposal which combines the blasting compaction dike with the sloping dike of filling bags,which can meet the requirement of saving the cost and shortening the construction period.