Practice of EPC project of Shanghai Yangtze River Bridge VTS navigation system
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The EPC project of Shanghai Yangtze River Bridge VTS navigation system includes multiple stages such as survey, design, construction, equipment installation and commissioning, trial operation, maintenance and management, etc. It is of beneficial use to try and explore. Under the circumstance of limited investment, tight schedule, heavy workload for coordinating, various stages with close relationship, this method guarantees the project quality and maximum efficiency. This article provides the views on the EPC experience of Shanghai Yangtze River Bridge VTS navigation system project.

    Reference
    Related
    Cited by
Get Citation

阳建云.上海长江大桥VTS导航系统工程总承包实践与探索[J].水运工程,2012,(12):97-100

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 11,2012
  • Published:
Article QR Code