On initial engineering schemes for training of Fujiangsha channel downstream the Yangtze River
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In combination with the flow dynamic characteristics and riverbed evolution features of Fujiangsha reach, it is supposed to implement different training schemes at the channel segment. Based on the analytical results from mathematical modeling and physical modeling, a best comprehensive training effect can be obtained through implementing engineering measures to the sand body at Shuangjiansha segment, which shall be firstly stabilized for the training of Fujiangsha channel. Protection of Shuangjiansha reach is a key river regime control project for the development of Fujiangsha deepwater channel. This paper proposes a basic engineering scheme for the channel training at Fujiangsha reach by comparing schemes of different layout and elevation for the protection of Shuangjiansha reach.

    Reference
    Related
    Cited by
Get Citation

阮 伟,徐 元,肖烈兵.长江下游福姜沙航道治理起步工程方案研究[J].水运工程,2012,(12):54-58

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 11,2012
  • Published:
Article QR Code