Abstract:This paper establishes the three-dimensional warm drain numerical simulation of Waigaoqiao electric power plant, and analyzes the probable warm drain horizontal distribution and vertical profile distribution,along with the time graph of intake temperature rise varing with the tidal fluctuation after implementation of the scheme, which provides a scientific foundation for scheme optimization and environmental effects evaluation of intake site selection.