Designing essentials in upgrading engineering of coal unloading terminal
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to save the coast line resource and guarantee the safety of port operation so as to realize the sustainable development of the port, the upgrading and renovation to the existing wharf tends to be a significant issue of water transport design industry. Taking the renovation project of Guangzhou Zhujiang Power Plant, Shenzhen Mawan Power Plant, Dongguan Shajiao Power Plant A as a study case, this paper analyzes the main problems and solutions concerning the structural plan, handling technology, and wharf auxiliary facilities in the design, hoping to serve as a reference for similar engineering projects.

    Reference
    Related
    Cited by
Get Citation

何建腾.卸煤码头升级改造设计要点[J].水运工程,2012,(11):102-106

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 20,2012
  • Published:
Article QR Code