On construction temperature of high-pile wharf based on ANSYS finite element analysis
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper proposes the idea of multi-objective control with the displacement of corner points, internal force of upper structures and base piles flexural controlled. With the help of building ANSYS finite element model, researches the laws of transformation and the force changes of wharf structure under different construction temperatures when the panel suffers a temperature difference or not. Through these laws, conclusions can be drawn that only when the construction temperature is higher than 11.1℃, can the displacement of corner points meets the regulatory requirements when there is no temperature difference of the panel. And the value should be higher than 21.4℃when there is a temperature difference.

    Reference
    Related
    Cited by
Get Citation

沈才华,牛兴伟,孙会想.基于ANSYS有限元分析的高桩码头施工期气温控制研究*[J].水运工程,2012,(11):89-93

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 20,2012
  • Published:
Article QR Code